Your building's weather extremes, in numbers you can use.
Pick a peril and set your design life. Add a design value or a damage threshold if you have one. You'll see how big a rare event is, how likely it is over the life of the asset as the climate warms, and what it is likely to cost. Switch to the engineer's view for the model, the priors and a quantile plot.
Runs entirely in your browser; nothing you type is sent. Download the London return levels (CSV) · Engineer? Design-life levels in Pro → · Many sites or assets? Portfolio →
What the paid Site Report adds
Your own values
Your design value checked against the record and the warming path, your damage threshold and cost per event turned into an expected cost, and the engineer's view (the model, the priors, the quantile plot and every return period), for London as for any other address.
Your address
Anywhere in the 15 counties of Southwestern Ontario: 20 long records fitted the same way as London, shifted to your point by a regional field of 90 stations. Check your address above before you pay.
A report you can share
A PDF with plain-words pages for owners and boards and a technical appendix for engineers and insurers (the records used, their weights, the shift to your point), and the data as CSV.
Ready for the other products
The expected repairs and premium figures for Studio's climate stress, and the hail and wind chances for the Reserve Workbench and Compass.
Data: Environment and Climate Change Canada (daily climate data, London airport stations), the Integrated Canadian Hail Database (Brunet and Brimelow, 2023; CC BY 4.0; filtered and re-counted by Musemakweli), and, containing information licensed under the Open Government Licence – Canada, the Canadian National Fire Database (Natural Resources Canada, Canadian Forest Service) and Environment and Climate Change Canada's Canadian National Tornado Database and short-duration rain (IDF) records. No provider endorses Musemakweli or its use of the information. Data and licences →
Decision support: not engineering, legal, insurance or investment advice. Design values remain the engineer's. Method E0.5 (the E0.3 fits at 20 long records with the regional field, the same for the free London preview and every paid report); see the method note.