Method overview
What Reserve Workbench and Reserve Compass compute, the ideas behind each figure, the data, the checks and the limits. The full technical note, with every equation and parameter for the provider's file (as PEO's software guideline asks), is available on request, and comes with a Workbench study, Workbench Firm and Compass Premium. Version: Musemakweli Reserve engine 0.2.0 · method M0.2 (2026-11) · parameters P0 (judgement, 2026-Q4).
1 Scope2 Table3 Futures4 Responses5 Plans6 Health score7 Lives8 AI reader9 Hail and wind10 Validation11 Limitations12 DataThe technical note
1. What it computes, and what it does not
Workbench takes the provider's own study: the component inventory, costs, lives, opening balance, inflation and interest assumptions, minimum balance and contribution plan. It does three things with it.
- It reproduces the study's 30-year cash-flow table, so the provider can see it agrees with their own to the cent.
- It runs futures in which construction costs, interest on the fund, cost estimates and the timing of work vary around the provider's figures, and reports how often the plan stays above the minimum balance and what the board's response costs when it does not.
- It finds the cheapest contribution plan, of a chosen shape, that stays above the minimum balance in a chosen share of futures.
It does not set component lives, costs or scope, which remain the provider's professional judgement, and it gives no opinion on any fund. The provider signs the study.
2. The study's own table, to the cent
With the statistics switched off, Workbench is an ordinary reserve fund table: each component is replaced when its remaining life runs out and every useful life after that (warranty repairs excluded), costs are inflated at the study's rate, contributions follow the plan's shape, and interest is earned on the opening or mid-year balance, as the study chooses. Only addition, subtraction, multiplication and division are used, so the table is exactly rounded in any browser.
Worked check on the fictional sample, 2027 to 2029: opening balance $1,850,000; inflation 2.5%; interest 3.0%, mid-year; plan $500,000, +6% for three years, then +2.5%. Closing balances $2,142,502.50, $2,744,727.58 and $2,345,788.09; the 2056 closing balance is $13,018,393.94.
3. The futures: what varies, and why
- Construction costs and interest move each year, linked to each other, with occasional cost-shock years like 2022's. Every run is made twice: centred on the study's own inflation and interest, and with costs outpacing interest by the historical gap (about 1 point a year over 2001-2020, from the Canadian Institute of Actuaries' Longevity of Infrastructure). Showing both stops the centring choice from hiding the main uncertainty.
- Cost estimates can be wrong, more so for hidden scope: each component carries an estimate class (low, medium or high uncertainty), and part of the error is shared across the building.
- Timing: work can land a year or two early or late, never before year 1, inside a warranty or before the previous replacement.
- Reproducible: the same inputs, seed and version always give the same futures; every output carries the version, the seed and a fingerprint of the inputs. Adding or removing a component never changes another's draws.
The demo runs 2,000 futures; paid studies run up to 10,000.
4. When a future needs action
A future "needs action" in the first year its balance would fall below the minimum. Three stylised responses show the order of magnitude of what that costs: a special levy, putting work off (with a premium for waiting), or borrowing. Sizes are reported only among the futures that need a response, as the typical size and the 1-in-10 worst, per average unit in today's dollars. They show orders of magnitude; they do not predict what a board will decide.
5. Funding plans
Each plan is shown with its cost per unit per month, percent funded in 10 years, its lowest balance and the share of futures it gets through, under both centrings:
The three usual goals, and the fully funded balance they use, follow the definitions in the Community Associations Institute's Reserve Study Standards (CAI, 2023; explained in CAI, 2025). The Confidence plan is Musemakweli's.
- Baseline: never below zero. Threshold: never below the minimum balance or a share of the fully funded balance. Full funding: at the fully funded balance from a chosen year. These are found exactly on the study's own rates.
- Confidence plan: the cheapest plan of the proposal's shape that stays above the minimum in a chosen share of futures (9 in 10, say), found exactly across the futures and checked against a search to the dollar. The engineer's page shows what each extra step of cushion costs.
6. The health score
One number out of 100, from three visible parts: how often the plan gets through the next 30 years without a special assessment (counts 40%), how often it gets through the next 10 (30%), and percent funded today, capped at 100% (30%). Bands: 80 and up Strong, 60-79 Fair, 40-59 Needs attention, under 40 At risk. The part holding the score back is always named, and the score is also given under the historical gap. On the fictional sample the score is 52 (Needs attention).
7. Remaining lives that learn from condition
A component's total life starts from the template's typical range (the firm's own range on Workbench Firm). A condition rating, read as a share of life used, updates it the way a measurement updates an estimate, giving a range for the remaining life rather than one year, never negative. The provider can adopt the middle value or let the futures draw the replacement year from the range. On Workbench Firm, the firm's own condition history calibrates the update.
8. The AI reader
The AI reads the previous study's component table and summary page and returns, for every row, the figures, where on the page they came from, and a confidence. Workbench checks each row (quantity times unit cost against the total, age plus remaining life against the useful life, low confidence) and flagged rows must be confirmed against the page before anything is used. The table is then rolled forward to the study year. The demo uses a recorded run on a fictional 2023 study; live reading comes with the paid plans.
9. Hail and wind (from Musemakweli Extremes)
For exposed components (roofs, windows, glass guards, siding, skylights), the yearly chance of a damaging hailstorm or gust at the building, as the climate warms, comes from Musemakweli Extremes. A share of damaging events forces a replacement, which brings the component's expected remaining life forward. The study is rerun with those lives and the extra contribution is shown, with the share of futures and the health score before and after. Thresholds and shares are the provider's to set; insured storm damage, less the deductible, stays outside the reserve fund.
10. Validation
Automated checks run on every change: the sample's table to the cent; every future equals the table when variation is switched off (20 random buildings, both interest conventions); the Confidence plan matches a search to $1 (50 random buildings); monotonicity; reproducibility and independent random streams; no work before year 1 or inside a warranty; the conditioning of every figure; the centring; and the response rules.
11. Limitations
- How much construction costs and interest move from year to year, how closely they move together and how often a cost-shock year comes are set by stated judgement, informed by Statistics Canada and Bank of Canada records rather than estimated from them. The technical note gives the values and the reasoning.
- No re-planning: real boards update the study every three years, which a run does not model.
- The construction price index measures new construction, not restoration work.
- The health score's weights and the condition model's settings are stated judgement.
- The response rules are stylised; shares are not calibrated to observed levy frequencies.
12. Data sources
- Adapted from Statistics Canada, Table 18-10-0289-01, Building construction price indexes, by type of building and division (series to the third quarter of 2026, released 29 October 2026). This does not constitute an endorsement by Statistics Canada of this product.
- Source: Bank of Canada, Government of Canada benchmark bond yields (retrieved November 2026). The Bank of Canada does not endorse this product.
- Community Associations Institute (2023). Reserve Study Standards; and (2025) An Explanation of CAI's Reserve Study Standards: the definitions of the usual funding goals.
- Côté, J.-S. and Juffs, J. (2022). Longevity of Infrastructure – Reserving and Risk Management in Condominium Maintenance in Canada. Research paper, Canadian Institute of Actuaries.
- Professional Engineers Ontario. Professional Engineers Using Software-Based Engineering Tools, guideline (April 2011).
The technical note
Every equation and parameter (the cost and interest model and its parameters, estimate error by class, the timing rule, the conditioning of each figure, the Planner, the funding goals, the condition model, the hail and wind adjustment and the version history), written so a provider can check the software and file it with the study. Engineers, actuaries and reviewers can ask for it; subscribers open it here.
Or write to info@musemakweli.com with your name, firm and what you are reviewing.
This page is product information from Musemakweli Risk Inc. On Workbench reports the footnote reads: Prepared by the preparing firm for the board of the corporation using Musemakweli Reserve software. The preparing provider is responsible for the study and its inputs. Decision support: not engineering, legal or financial advice.